Project overview
A new public toilet building on Te Rangitautahanga Road will provide a modern, fit-for-purpose facility for residents and visitors in Tūrangi.
The new seven-toilet facility will include six standard individual toilet units and one accessible unit. The toilets are being built and installed by Exeloo, a specialist in public toilet systems both in New Zealand and overseas, supported by local subcontractors.
Careful thought has gone into the design, including a striking feature wall created by local artist Te Maari Gardiner. A design working group comprising hapū and community representatives, Council officers, and the manufacturer worked together to ensure the facility is not only safe, durable and fit for purpose, but also reflects the area's history, identity, and people.
The old public toilet block was removed in October, along with a small number of trees in the vicinity, to make way for the new toilets. Some ground works will be carried out in preparation for the new building, while new kowhai trees are going to be planted in the adjacent car park.
The new facility is being prefabricated off-site and will be transported to Tūrangi for installation in the last week of October.
The new toilet block is due to open to the public in mid-November.
| Location: | Te Rangitautahanga Road |
| Project status: | In progress |
| Contractor: | Exeloo Dempsey Contractors |
| Start date: | September 2026 |
| Completion date: | November 2026 |
Wharepaku (toilet) facilities
The new public toilet block will include the following facilities:
- 4 x standard, individual use, unisex toilets
- 2 x standard, individual use, female/wāhine only toilets
- 1 x accessible toilet with baby changing facilities.
Project construction timeline
- September 2026: Off-site pre-fabrication of the toilet block starts.
- October 2026: Old public toilet block removed. Pre-fabricated toilets transported to Tūrangi for installation.
- November 2026: The new facility is due to open in mid-November.
Project updates
New Tūrangi public wharepaku arrives this week
Tuesday 28 October
You may have noticed some activity recently at the site of the old wharepaku (or public toilets) in Tūrangi. The old facility has now been removed, making way for a brand-new public amenity.
Background
In early 2025, substantial damage to the existing public toilets was discovered. Following a structural engineering assessment, a decision was made to demolish and replace the public toilet facility earlier than originally planned.
Exeloo were awarded the contract to design, build and commission the new toilets following a competitive, open tender process in early 2026.
Exeloo have vast experience working in this highly specialised space and are known for designing resilient, hygienic and safe public toilet systems. They have partnered extensively with other Councils across New Zealand, Australia and North America. Most recently, Exeloo were contracted to build new public toilets on the Mangakino lakefront.
Stay up-to-date
We’ll share updates as the project takes shape and if there are any changes to timing, access or other information. You can stay up-to-date by:
- Subscribing to our weekly Connect Korero e-newsletter
- Following us on Facebook and Instagram
- Downloading the Antenno app to get council notifications sent directly to your phone